3
Storey Shop Office- Specification |
Building Structure : |
Reinforced Concrete Structure
(including Emergency staircase) |
Roof
Structure : |
a) GI Roof Truss
b) Metal deck roofing sheet w/ laminated bubble aluminum foil
c) Rain Water good
|
Ceiling
: |
a) Plaster ceiling at 2st floor
b) Skimcoat to soffit of slab |
Floor and Wall Tile : |
i) Floor Tile
a) Bathroom and Pantry
12" x 12" ceramic (matt finished)
b) Walkway
1' x 1' Homogeneous tile patterned w/ washed pebble chipping
ii) Wall Tile
a) Bathroom
8" x 10" up to 5' high
b) Pantry
8" x 10" ceramic up to 5' high
|
Door
: |
a) Aluminum Roller Shutter
b) Fire Door (1 hr rated): 2 no
c) PVC (Bathroom)
d) Plywood Flush Door (Back)
|
Window
: |
a) NA Aluminum Sliding Window at Front
b) Naco Lourver Window at back |
Plumbing and Sanitary
: |
a) Washing basin: 3 nos
b) Squating Pan: 3 nos
c) Bib tap: 3 nos
d) Shower rose: 3 nos
e) Single drainer and Single bowl Aluminum sink: 3 nos
f) 300 gal polytank: 3 nos
|
Lock : |
a) Quality Cylindrical Lockset |
Electrical
Point : |
a) Lighting Pt: 23 nos
b) Power Pt: 12 nos
c) Phone Pt: 1 no
d) Fuse Box: 3 nos
e) Meter Box: 3 nos
f) Emergency Light: 9 nos
g) Exit Light: 2 no |
Painting : |
a) External:
b) Internal:
c) Metal and timber : 2 coats of oil base gloss paint |